Revised Schedule M and WHO-GMP demand airlocks, continuous monitoring, and pristine sterile blocks. For a mid-sized unit, "upgrading" meant a two-crore quote for just the HVAC alone. I sold the plant last year. My engineer's salary now pays the EMI on the loan I took to try.
#exams#study
Jump in to reply β no account needed.